SAME-DAY SERVICEResponsive commercial support across South East Queensland
FIVE-YEAR WORKMANSHIP GUARANTEEOur workmanship is backed for five years
ONE CONTRACTORBeer systems, refrigeration, HVAC and electrical
CM3 PREQUALIFIED CONTRACTORPrequalified for contractor compliance and supplier onboarding

Project · Sandgate, Brisbane

Bubba Gump Sandgate major refurbishment

Beer system, commercial cold rooms and air conditioning delivered through the HVACR Group as part of the major refurbishment of Australia's first Bubba Gump Shrimp Co. restaurant.

Beer Works commercial beer system installation capability

Project overview

Three critical hospitality systems. One coordinated group.

The Bubba Gump Shrimp Co. venue at 94 Rainbow Street, Sandgate underwent a major refurbishment ahead of the brand's first Australian opening in July 2026.

Beer Works installed the commercial beer system. ACRO Refrigeration delivered the cold-room work, while Shelair delivered the commercial air-conditioning work.

The project demonstrates the practical advantage of the HVACR Group model: beer dispensing, refrigeration and HVAC can be delivered and supported by related specialist businesses rather than being treated as disconnected systems.

The venue

Australia's first Bubba Gump Shrimp Co.

Bubba Gump Shrimp Co. selected Sandgate for its first Australian restaurant, opening at 94 Rainbow Street in the heart of Brisbane's bayside suburb.

The venue occupies the former Sandgate Post Office Hotel site and was extensively refurbished before opening. The location is close to the Sandgate waterfront and forms part of the area's established hospitality precinct.

For a venue of this type, reliable beer dispensing, cold storage and air conditioning are all operationally important. A failure in any one of those systems can affect customer experience, product quality or trading capacity.

One-contractor advantage

Less coordination. Clearer responsibility.

Major refurbishments frequently involve several specialist trades working around each other. Bringing related systems together under one group simplifies delivery and future service.

Commercial beer systems

Designed for real service conditions.

A restaurant beer system needs to do more than pour correctly during commissioning. It has to remain stable during busy service periods, maintain product temperature and be accessible for cleaning and maintenance.

Beer Works works across beer reticulation, glycol cooling, beer fonts, keg-room requirements, line cleaning, system balancing and ongoing maintenance.

Commercial beer tap systems →
Beer line cleaning →
Glycol systems →

Frequently asked questions

Bubba Gump Sandgate project

What work did Beer Works complete?

Beer Works installed the commercial beer system as part of the major refurbishment.

Who completed the cold rooms?

ACRO Refrigeration completed the cold-room work through the HVACR Group.

Who completed the air conditioning?

Shelair completed the commercial air-conditioning work.

Was this a new build?

No. The works formed part of a major refurbishment of the existing Sandgate venue before the Bubba Gump Shrimp Co. opening.

Hospitality refurbishment

Beer systems, refrigeration and HVAC through one group.

Talk to Beer Works about commercial beer systems for restaurant, pub, club, hotel and hospitality refurbishment projects.